Easter engineering works - Southern and Thameslink | Tim Loughton Skip to main content
Site logo

Main navigation

  • Home
  • About Tim
  • Tim 4 Sussex Mayor
  • News
  • Gallery
  • Contact
  • facebook
  • twitter
  • instagram
Site logo

Easter engineering works - Southern and Thameslink

  • Tweet
Wednesday, 5 April, 2017
  • Reports
Easter engineering works - Southern and Thameslink

Please see the below details regarding Easter engineering works on Southern and Thameslink routes.

  • Most Southern Victoria services diverted to/from London Bridge on Sunday 16th April
  • Gatwick Express passengers to use Southern and Thameslink services to and from London
  • Only minor changes on the rest of the Southern/Thameslink network over the Easter period

There will be no Southern and Gatwick Express train services on Easter Sunday to or from London Victoria station due to planned engineering works by Network Rail, the train operator confirmed today.

Most of Victoria services will be diverted to London Bridge and Gatwick Express passengers will be able to use Southern and Thameslink services to and from London.  Rail replacement services will run between Victoria and Streatham Hill/East Croydon.

There will also be some minor amendments to some other Southern and Thameslink services over the Easter bank holiday period. Routes affected are:

On Friday 14, Saturday 15 and Monday 17 April:

  • Buses will replace trains between West Croydon and Epsom Downs

On Saturday 15 April:

  • Gatwick Express services will run half-hourly between Victoria and Brighton calling at Gatwick Airport.

On Sunday 16 April:

  • There will be no train service into or out of London Victoria. There will be no Southern or Gatwick Express services operating from the station all day, but most Southern services will be diverted to run to/from London Bridge and Gatwick Express passengers can use Southern and Thameslink services to get into and out of London.
  • Buses will replace trains Barnham and Bognor Regis. However, until 09.20, buses will also replace trains between Ford and Littlehampton.
  • Buses will replace trains between West Croydon and Sutton
  • Until 08.50, buses will replace Thameslink trains between St Albans and West Hampstead Thameslink

Angie Doll, Southern's Passenger Services Director said: "On Easter Sunday, passengers will still be able to get in and of London via London Bridge and Blackfriars stations.  We’re sorry about the inconvenience but essential and necessary maintenance works are planned and are taking place over Easter when passenger volumes are lower than in the working week.”

Passengers are advised to check train times and availability by calling National Rail Enquiries on 08457 48 49 50 or nationalrail.co.uk.

Show only

  • Articles
  • European News
  • Local News
  • Media
  • Opinions
  • Reports
  • Speeches
  • Speeches in Parliament
  • Westminster News

Tim Loughton Former Sussex MP and Prospective Sussex Mayoral Candidate

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Tim
  • Tim 4 Sussex Mayor
Conservatives
  • facebook
  • twitter
  • instagram
Promoted by James M. Butcher on behalf of Tim Loughton, all of 69 The Warren, Burgess Hill, RH15 0EA.
Copyright 2025 Tim Loughton Former Sussex MP and Prospective Sussex Mayoral Candidate. All rights reserved.
Powered by Bluetree